Investor Object Realization Gallery Date of ending
POLISH AIR NAVIGATION SERVICES AGENCY
ul. Wieżowa 8
Training and administration building
ul. Wieżowa 8
Complex assembly of plumbing system:
  • sanitary system
  • surface water drain
  • water supply system
  • chilled water system
in progress
BANK GOSPODARSTWA KRAJOWEGO
Al. Jerozolimskie 7
Headquarters of Bank Gospodarstwa Krajowego
Al. Jerozolimskie 7
Construction and finishing works of all constructing branches - reconstruction of escape route in the corridor at -1 and -2 levels January 2016
AMBASSADOR
Warsaw, Mokotów
Ambassador's Mansion
Warszawa, Mokotów
Comprehensive renovation and modernization of Ambassador's Mansion:
  • construction works and interior overhaul
  • façade renovation
  • interior decoration
  • interior architectural design
  • wiring system replacement: indoor and outdoor
December 2015
ZAKŁAD GOSPODAROWANIA NIERUCHOMOŚCIAMI W DZIELNICY PRAGA-POŁUDNIE W M.ST. WARSZAWY
w Dzielnicy Praga-Południe m.st. Warszawy ul. Walewska 4
Apartment buildings in Warsaw
ul. Meissnera 7, 9, 11 i 13
Comprehensive renovation of the roof (~5 400 m2), balconies and terraces (~1 830 m2) grudzień 2015
NATIONAL CENTRE FOR CULTURE POLAND
ul. Płocka 13
Galeria Kordegarda Art Gallery
ul. Krakowskie Przedmieście 15/17
Comprehensive renovation and modernization of the Gallery:
  • construction and finishing works, overhaul, modernization
  • ventilation system
  • air conditioning system
  • wiring system and telecommunication installation
July 2015
NATIONAL MUSEUM IN WARSAW
al. Jerozolimskie 3
Gmach Główny MNW
al. Jerozolimskie 3
GENERAL CONTRACTING Modernization of Gallery of Old European Masters:
  • construction works- steelwork to panel walls according to architectural design
  • exhibition lightning with changing colour of the light and illuminance
  • Barrisol stretch ceilings and walls
Works were conducted during opening hours. Works executed under supervision of the Conservator.
December 2014
"IMPRESJA" APARTMENTS WILANÓW
Housing community
ul. Sarmacka 10, Warsaw

Apartment building in Warsaw, ul. Sarmacka 10 D
ul. Sarmacka 10 D
comprehensive repair of the roof in the inverted roof technology December 2014
National Museum in Warsaw

Museum in Nieborów and Arkadia
Nieborów 232
General Contractor Comprehensive overhaul of the Haunting Pavilion:
  • repair and renovation work
  • roof construction including placing the pantile roofing
  • woodwork
  • construction work
  • thermomodernization
Works executed under supervision of the Conservator
December 2014
CITY OF WARSAW

Muzeum Warszawskiej Pragi (Museum of Praga)
ul. Targowa 50/52
Comprehensive asssembly of:
  • plumbing system
  • central heating system and process heating system
  • and submission of as-built documentation
Works executed under supervision of the Conservator
June 2014
National Museum in Warsaw
al. Jerozolimskie 3
Main Building of National Museum in Warsaw
al. Jerozolimskie 3
General Contractor
Modernization of Farras Gallery
  • construction work
  • modernization and finishing work
  • electrical work
Works executed under supervision of the Conservator
May 2014
National Museum in Warsaw
al. Jerozolimskie 3
Museum in Nieborów and Arkadia, Nieborów 232 National Museum in Warsaw department
al. Jerozolimskie 3
Comprehensive repair of the roof including covering it with shingle and partial replacement of wooden window frames in buildings, i.a.: Clerk Houses nr 1 and nr 2, Orangerie, Burgrave House. Works executed under supervision of the Conservator August 2014
National Museum in Warsaw
al. Jerozolimskie 3
Main Building of National Museum in Warsaw
al. Jerozolimskie 3
General Contractor in 'design-build' system Thermomodernization
  • submission of the project and the as-built documentation
  • modernization of central heating system
  • insulation of the building
  • improvement of skylights' insulation
  • assembly of air conditioning and ventillation in the part of the Gallery
  • replacement of the exhibition and service lightning in Gallery to the color shifting LEDs
  • replacement of oak window frames
Works executed under supervision of the Conservator
June 2013
ASSECCO POLAND S.A.
al. Armii Krajowej 80, Rzeszów
A-class Office Building- Warsaw Office Park, ul. Branickiego/ al.. Rzeczpospolitej
ul. Branickiego / al. Rzeczpospolitej
Comprehensive performance of sewerage system and sewerage system ports, and rain water draining system with retention tank. June 2012
Warsaw- Modlin Airport
ul. gen. Wiktora Thommee, Nowy Dwór Mazowiecki
Passenger Terminal
ul. Gen. Wiktora Thommee,
Nowy Dwór Mazowiecki
Assembly of
  • plumbing system
  • heating and refrigeration plant
  • technological drainage
April 2012
RONSON DEVELOPEMENT PROPERTIES
ul. Tczewska / Gwiaździsta, Warszawa
Apartment building
ul. Tczewska / Gwiaździsta, Warszawa
Third Stage. Comprehensive assembly of
  • central heating system
  • plumbing system
  • ventillation
  • and submission of as-built documentation
March 2012
National Museum in Warsaw
al. Jerozolimskie 3
Museum in Nieborów and Arkadia
Nieborów 232
General Contractor: comprehensive reconstruction of the historic coach house next to the Palace Complex of the Radziwiłł Family. Works executed under supervision of the Conservator December 2011
Gas Transmission Operator GAZ-SYSTEM S.A.
Rembelszczyzna department

ul. Jana Kazimierza, Rembelszczyzna
comprehensive modernization and repair of the exsisting intermediate pumping station of rain water with sealing walls on level -7 m December 2010
Gas Transmission Operator GAZ-SYSTEM S.A.
Rembelszczyzna department

ul. Jana Kazimierza, Rembelszczyzna
comprehensive repair of hydrant network, fire pools and auxiliary devices December 2010
TP EMITEL Sp. z o.o.
ul. Pilotów 4c, Cracow
the Palace of Culture and Science, Warsaw
Warszawa
General Contractor for preparing to digital broadcasting TV programs. Modernization of rooms located on the 31st and 31st A floors
  • finishing modernization works
  • assembly of load-bearing stucture of apparatus
  • wiring systems
  • teletransmission network
  • air conditioning and ventillation
  • the access control system
  • structural network
Works executed under supervision of the Conservator
December 2010
National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
Main Building of National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
General Contractor comprehensive: replecement and modernization of roof structure and roofing with insulation over the 1st and 2nd wing of the building. Implementation plan
  • replacing the wooden construction of the roof to the steel one
  • construction works
  • specialized roofing works
  • wiring systems
Works executed under supervision of the Conservator
December 2010
BUREAU VERITAS SP. Z O.O.

Office building
ul. Migdałowa 4, Warszawa
comprehensive modernization, raising the standard of the office space February 2010
SUN CHEMICAL

Office building
Marki
Comprehensive modernization of the office space January 2010
UNIKKON INTEGRAL SP. Z O.O.
al. Jana Pawła II 34, Warszawa
Śródmieście Distric Office building
ul. Nowogrodzka 43, Warszawa
repair of server room; construction works December 2009
ABG S.A.
al. Jerozolimskie 123, Warsaw
HARIBO office building
ul. Górczewska 137, Warszawa
Comprehensive modernization of the office space December 2009
Public Health Care Facility Sulejówek
Sulejówek
Public Health Care Facility building
al. Armii Krajowej 21, Sulejówek
central heating system modernization October 2009
SUN CHEMICAL

production hall
Marki
performance of the car parks and storage areas September 2009
RONSON DEVELOPEMENT PROPERTIES
ul. Magazynowa 1, Warszawa
Apartment building
ul. Tczewska /Gwiaździsta, Warszawa
Stage II. Comprehensive assembly of
  • central heating system
  • plumbing system
  • ventillation and submission of as-built documentation
May 2009
JANA KAZIMIERZA DEVELOPEMENT
ul. Taborowa 62, Warszawa
Complex of apartment buildings
Etap I
Stage II.
  • Plumbing system
  • central heating system
  • process heating system
  • chilled water system
April 2009
Gas Transmission Operator GAZ-SYSTEM S.A.
Rembelszczyzna department
gas compressor station
Jana Kazimierza 3, Rembelszczyzna
replecement of main collector in sanitary system April 2009
Gas Transmission Operator GAZ-SYSTEM S.A.
Rembelszczyzna department
gas compressor station
stage I and II.
Jana Kazimierza 3, Rembelszczyzna
Comprehensive modernization of pretraitment rain water tank. Hard implementation because of high level of the subterranean water and difficult access March 2009
EMERSON PROCESS MANAGEMENT
ul. Konstruktorska, Warszawa
Office building
ul. Konstruktorska 11 a, Warszawa
Comprehensive modernization of the office space
  • interior room design
  • implementation of the structural network in 5 EU group
March 2009
WEISS INWEST SP. Z O.O.
al. Jerozolimskie 123, Warszawa
Office building
ul. Górczewska 137, Warszawa
Comprehensive modernization of the office space February 2009
PKO BANK POLSKI
ul. Puławska 15, Warszawa
Centre Training Area
ul. Puławska 132 a, Serock
General Contractor
  • evaluation of technical state of boiler room
  • modernization of oil boiler room 1 MW, 2x500 kW Buderus
  • execution of engineering design of boiler room's heating system
October 2008
National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
Main Building of National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
General Contractor comprehensive: replecement and modernization of roof structure and roofing over the 6tht and 7th wing of the building. Implementation plan
  • replacing the wooden construction of the roof to the steel one
  • construction works
  • specialized roofing works
  • wiring systems
Works executed under supervision of the Conservator
January 2008
Housing commmunity MOKOTÓW
ul. Batorego 39, Warszawa
Residential-service building
ul. Modzelewskiego / al. Wilanowska, Warszawa
Preparation the design documentation of the building in the field of sanitary system:
  • foredesign
  • building project
  • engineering design
  • investment cost estimate
January 2008
RONSON DEVELOPEMENT PROPERTIES
ul. Magazynowa 1, Warszawa
Apartment building
Stage II
ul. Tczewska / Gwiaździsta, Warszawa
Comprehensive assembly of
  • central heating system
  • plumbing system
  • ventillation and submission of as-built documentation
October 2007
REAGROUP ESTATE POLSKA
al. Jerozolimskie 156, Warszawa
Renault service station
al. Jerozolimskie 156, Warszawa
General Contractor: Design and performance
  • island station roof for cars 550 m2
  • car park 3600 m2 with hardening and draining
  • flood pool 50m3; car park lightning
August 2007
REAGROUP ESTATE POLSKA
al. Jerozolimskie 156, Warszawa
Renault service station
ul. Lewinowska, Warszawa
General Contractor: adapting to the needs to the Service School
  • construction works
  • sanitary systems
  • wiring systems
  • technological systems
January 2007
ABG STER-PROJEKT S.A.
ul. Magazynowa 1, Warszawa
"Millenium Plaza" building; floors: 4,21,23,27,28
General Contractor: overhaul and adapting the office space
  • construction works
  • installation works
December 2006
FLORALAND DISTRIBUTION SP. Z O.O.
ul. Żeromskiego 2 b, Legionowo
Office building and high storage hall
Stanisławów I, gm. Nieporęt
Complement the design of sanitary systems and assembly
  • central heating system
  • air conditioning and ventillation
  • external sanitary systems
October 2006
SEP-MED. SP. Z O.O.
ul. Złota 44/46, Warszawa
Non-Public Health Care Facility
ul. Hoża 19, Warszawa
General Contractor
adpating business premises.
  • Construction works
  • sanitary systems
  • wiring systems
  • interior finishing works
August 2006
WARTA INWESTYCJE SP. Z O.O.
ul. Chmielna 85/87, Warszawa
"Warta Tower" Building
adapting space on the ground floor to fitness club.
  • Construction works
  • finishing works
  • sanitary systems
  • wiring systems
March 2006
SUN CHEMICAL SP. Z O.O.
ul. Okólna 46 a, Marki
production hall, Marki
Comprehensive modernization of technological systems udes for production, packaging and customizing of printing inks.
  • Ventillation
  • pumps repair
  • assembly of purification plant
  • implementation and assembly of tanks
December 2005
YOURS PHOTOGRAPHY
ul. Książęca 15, Warszawa
Office building nr 3
ul. Książęca 15, Warszawa
General Contractor: adapting an apartment building for office purposes class AA:
  • implementation plan in terms of sanitary and wiring systems
  • construction, sanitary and electrical works
October 2005
CINEMA CITY "WOLNOŚĆ"
ul. Kościuszki1/5, Częstochowa
complex of cinemas
  • turnkey boiler room VIESSMANN (VOITOPLEX 345 Kw x2)
  • wiring system technology AKPiA
  • realization made in 2 weeks
December 2004
TESCO (POLSKA) SP. Z O.O.
ul. Kapelanka56, Kraków
hypermarket
ul. Stalowa, Warszawa
General Contarctor: refitting HIT superstore to TESCO. Rearrangement in full range of construction works interior and external December 2004
National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
Main Building of National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
Stage IV. Modernization of skylights with accompained works: roof repair
  • replacing roofing paper, flashing
  • construction works: repair fire protection of the steel stucture of skylights
Works executed under supervision of the Conservator
November 2003
SUN CHEMICAL

Warehouse and production plant
Marki
General Contractor: comprehensive assembly of technological systems of production, packaging and customizing of printing inks and sanitary systems.
  • Assembly and startup of all devices and technological systems
  • assembly of handled solvent tanks V=50 m3, 3 pcs.
  • electrical works in Atex areas
  • implementation and dubmission the as-biult documentation
August 2003
SM KOMFORT
ul. Cybulskiego 3, Warszawa
"Villa Monaco" apartment building
  • plumbing systems
  • artificial ventillation
  • gas boiler-room (HYDROTHERM 2x310 kW)
  • plumbing port; gas piping
July 2003
Łomianki parish
ul. Warszawska, Łomianki
Integracyjne Centrum Dydaktyczno-Sportowe Łomianki
Gas boiler room (VIESSMANN 1x575 kW + 2x720 kW):
  • boiling room technology
  • electrical works and automatics
  • water purification plant
May 2003
National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
Main Building of National Museum in Warsaw
al. Jerozolimskie 3, Warszawa
Stage III. modernization of skylights with accompained works: systems
  • air conditioning and ventillation
  • construction works: repair the fire protection of the steel stucture of skylights
  • electrical works and automatics
Works executed under supervision of the Conservator
October 2002
State Enterprise "Porty Lotnicze"
ul. Żwirki i Wigury 1, Warszawa
Airport Security Guard building
ul. 17 stycznia, Warszawa
Assembly of
  • plumbing system
  • central heating system and process heating system
  • air conditioning
  • chilled water system
  • automatics system
December 2001
SMB "OPTIMA 2000"
ul. Tomcia Palucha, Warszawa
"Ursus" apartment buildings complex
Gas boiler room (BUDERUS 2x455 kW)
  • electrical works
  • boiler automatics
April 2001
WIŚNIOWY DEVELOPMENT "E" SP. Z O.O.
ul. 1-go Sierpnia 4, Warszawa
water-pipe network
ul. Sasanki, Warszawa
Jacking under ul. Sasanki 2xØ800 up to water-pipe crossing Ø250 and cutting into water-pipe collector Ø1200 responsible for supplying Ursynów district. January 2001
Sulejówek Commune Office

intermediate pumping station
comprehensive modernization of intermediate community pumping station December 2000
"OSIEDLE MŁODYCH"
ul. Szklane domy 5, Warszawa
„Osiedle Młodych”
  • heating network
  • gas grid
  • central heating system, plumbing system
  • central heat and hot water distribution centre
December 2000
AGW KOLOR
ul. Piłsudskiego 141, Łódź
Knitted fabric dye-house
comprehensive modernization of steam and gas boiler room (VIESSMANN 4200 kW)
  • Boiler room technology
  • electrical works and automatics
  • construction works
  • assembly of water purification plant for dye-house building
  • assembly of degassing system
September 1999
P.P.H. AWA S.C.
ul. Staniewicka 18, Warszawa
knitting plant
ul. Staniewicka 18, Warszawa
comprehensive assembly of ventillation and air conditioning in office spaces and manufacturing rooms
  • implementation plan
  • electrical works and automatics
September 1999
KRKA POLSKA SP. Z O.O.
ul. Równoległa 5, Warszawa
KRKA Complex. Pharmaceutical plant
ul. Równoległa 5, Warszawa
  • plumbing systems
  • sprinkler system
  • high storage
  • external plumbing systems
July 1999
HB BOGDAN HORSZCZARUK
ul. Sienkiewicza 26. Nieporęt
apartment buildings- ribbon building
ul. Jana III 9,11,13, Nieporęt
comprehensive turnkey construction June 1999
Polish State Railways
Warsaw
Warszawa-Śródmieście railway station
comprehensive overhaul of
  • central heating system and process heating system
  • ventillation
  • sanitary system; wiring system
  • construction and finishing works
June 1999
SMB "OPTIMA 2000"
ul. Herbsta, Warszawa
residential-service building complex
  • external systems: plumbing and heating
  • thermal centre
January 1999
Polish State Railways
Warsaw
Railway housing estate
ul. Kolejowa 13, Małaszewicze
comprehensive overhaul and modernization of boiler house supported by coal to oil-supported (VIESSMANN 3x575 kW)
  • Design documentation
  • construction works, boiler room technology
  • electrical works
November 1998
WFTS "POLLENA"
ul. Maarywilska 58, Warsaw
Plastics Factory of Warsaw
  • closed chilled water system
  • overhaul of the roof
  • electrical works
November 1998
Wawer parish

Wawer parish area
preliminary design of water supply and wastewater drainage on the whole parish area May 1997
Polish State Railways
Warsaw
Polish State Railways Hospital
ul. Brzeska, Warszawa
comprehensive overhaul of nutritional block.
  • Contstruction works
  • sanitary system
  • wiring system
  • finishing works
February 1997
Polish State Railways
Warsaw
CKS urological ward
ul. Bursztynowa, Warszawa
comprehensive overhaul of nutritional block.
  • Contstruction works
  • sanitary system
  • wiring system
  • finishing works
December 1996
Dairy plants "Nutricia Ovita"
Węgrów
Dairy plants "Nutricia Ovita" Węgrów
comprehensive replacement of technological sewerage system and acid-resistant pipes August 1996
WFTS "POLLENA"
ul. Maarywilska 58, Warsaw
Plastics Factory of Warsaw
Comprehensive modernization of sewage-treatment plant
  • construction works
  • technological works
June 1996
DAEWOO ELECTRONICS MANUFACTURING POLAND
ul. Parzniewska 18, Pruszków
Washing machine Plant
comprehensive turnkey realization of
  • technical building
  • boiler room 2500 kW
  • compressor room 1,1 m3/s
  • water purification plant with hydrophore room
  • transformer station
  • external water supply system and sewage system
December 1995
VOIVODESHIP PUBLIC COMPLEX OF NEUROPSYCHIATRIC HEALTH CARE UNITS FOR CHILDREN AND YOUTH - TECHNICAL SECTION
Zagórze k. Warszawy
WZPZNOZ HOSPITAL
sewage treatment-plant: comprehensive works in full range March 1994
SWEDEN CENTER

IKEA pavilion
al. Jerozolimskie, Warszawa
comprehensive assembly of sprinkler system July 1992
SMBJ NIEPORĘT

"GŁOGI" housing estate
ul. Jana Kazimierza, Nieporęt
comprehensive construction of sewage treatment plant BIOKON type, including design complement June 1992
Full list of references available upon request. Contact us »